ETH
eThekwini Metropolitan Municipality
City Hall, 263 Dr Pixley Kaseme Street
Durban, KwaZulu-Natal, 4001
Metropolitan municipality; seat Durban — largest city in KZN
Built from the documents Govermate has read from ETH. Every line below comes from a source document, not from an editorial description.
Published by ETH. These are records Govermate has read from this provider, not opportunities to apply for.
93 further descriptions not shown.
"id":"170257","title":"34827(5E) ","status":"active"
Supply, delivery, installation and \r\ntesting of outdoor 132kV and 275kV \r\nswitchgear and associated equipment \r\nfor a period of 36 for various \r\nsubstations
Emailed queries are to be submitted by 2026-10-15. Emailed questions and answers will be consolidated and posted on eTenders/Municipal website by 2026-10-22.
"description":"Supply, delivery and offloading of \r\nMPVC pipes for a period of 36 months "
Emailed queries are to be submitted by 2026-10-02. All questions and answers will be consolidated and posted on eTenders/Municipal website by 2026-10-09
Price the BOQ for the sub-phase you want to tender for and complete the price BOQ for the sub-phase and the employer will award sub-phase per service provider.
C1.2.3.17 CONTRACT PERIOD on Page 39, an addendum will be issued to change the contract duration to 20 months.
The 4 sub-phases making up this tender are: Sub-Phase 2B-1: 253 sites Sub-Phase 2B-2: 214 sites Sub-Phase 2B-3: 275 sites Sub-Phase 2B-4: 234 sites
The correct Closing Date is Friday, 06 March 2026 at 11h00.
Document: Rates-Based Panel Contract for Roadway Related Construction Works to be used As-and-When-Required, for a period of 3 Years (CIDB Grades 5CE and 6CE).
2140 classified as something a person can apply for, 500 identified by reading.
Upgrading of Zezwe, Mvoti, Ntaka and Landa Roads in Ntuzuma, Ward 38
Stormwater upgrade for the Shabally Road Canal Wall, Durban South, Ward 32
Creation of a sewer rodding framework contractor panel to be utilized within the Sanitation Operations Department for a period of 36 months, as and when required
Creation of a sewer vacuum tankering framework contractor panel to be utilized within the Sanitation Operations Department for a period of 36 months, as and when required
Creation of a sewer winching framework contractor panel to be utilized within the Sanitation Operations Department for a period of 36 months, as and when required
Creation of a sewer high pressure jetting framework contractor panel to be utilized within the Sanitation Operations Department for a period of 36 months, as and when required