Official source
Source domain: durban.gov.za
Collected on 17 June 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Coastal stormwater and catchment infrastructure repairs (as and when required) for 36 months in INK areas
This document sets the minimum Health and Safety requirements that must be met for construction work under eThekwini Municipality’s 36-month coastal stormwater and catchment management area-based infrastructure repairs contract in the INK (Inanda, Ntuzuma & KwaMashu) areas. It specifies obligations such as COIDA good standing proof, construction work permit evidence, and how the permit number must be displayed before work starts.
Places
eThekwini, KwaZulu-Natal
Reference
https://www.durban.gov.za/uploads/0000/13/2026/05/28/34794-1d-she-specification.pdf
Opening Date
2 June 2026
The document's recorded date is 23 April 2026. Confirm on the official source.
COASTAL STORMWATER AND CATCHMENT MANAGEMENT AREA BASED INFRASTRUCTURE REPAIRS AS AND WHEN REQUIRED FOR 36 MONTHS: INK (Inanda, Ntuzuma & KwaMashu Areas ) RIGION