Opportunities
Browse government tenders, quotations, vacancies and documents across South Africa.
Showing opportunities with a recorded closing date that has not passed. Choose another status to browse historical records.
The regulator lists public hearings on regulatory matters that members of the public may attend.
- Who it is for:
- members of the public and stakeholders
- How to act on it:
- Visit the Public Hearings section of the NNR website for hearing details.
The regulator offers public education resources and services about nuclear safety and regulation.
- Who it is for:
- members of the public
- How to act on it:
- Visit the Public Education section of the NNR website.
The public can read or use this document for information about the proposed extension of the NECSA Pipestore Facility on Thabana, including its design, transfer processes, monitoring, site, safety assessment and emergency planning.
- Who it is for:
- Members of the public and other stakeholders seeking information about the facility extension
- How to act on it:
- Read or download the public information document from the stated PDF link.
The public can use this Afrikaans document for information about the proposed extension of the NECSA Pipestore Facility at Thabana Afrikaans, including the facility, site, safety assessment, emergency planning and proposed development stages.
- Who it is for:
- The general public and all interested parties
- How to act on it:
- Read the document using the published PDF link.
The public comments received on Necsa’s application to extend the Thabana Pipestore Facility, together with Necsa’s responses, are made available for public access through the NNR and NECSA websites.
- Who it is for:
- Members of the public and interested stakeholders
- How to act on it:
- Visit http://www.nnr.co.za/news-room/public-notices/ and select ‘Necsa Thabana Pipestore Extension’, or visit https://www.necsa.co.za/public-notice/.
Nuclear authorisation holders, users and transporters of radioactive material, as well as other authorities or organisations, can use this procedure to urgently notify the NNR about an occurrence, accident or incident involving radioactive material or to request an emergency authorisation change.
- Who it is for:
- Nuclear authorisation holders, users and transporters of radioactive material, and authorities or organisations needing to report an accident or incident involving radioactive material
- How to act on it:
- Telephone an NNR representative during all hours, calling the representatives listed in attachment 1 in sequence from the top until one person is contacted to receive the notification message.
The National Nuclear Regulator makes this unrestricted regulatory guide available for use by people and organisations dealing with the education, training, qualification and recognition of appointed medical practitioners.
- Who it is for:
- Medical practitioners and organisations with responsibilities relating to protection and safety
- How to act on it:
- Use the guide through the published PDF reference.
The guide describes a process for assessing the education, training, qualifications and experience of an individual proposed by an authorisation holder for appointment as an appointed medical practitioner, including recognition and appointment as an AMP.
- Who it is for:
- An individual proposed by an authorisation holder to be employed as an appointed medical practitioner
- How to act on it:
- Follow the AMP training and recognition process, including the education and training, additional qualifications and experience, and recognition and appointment stages identified in the guide.
The public can access the Public Information Document prepared by Eskom Holdings SOC Limited to understand the details of the Nuclear Installation Site Licence application for the Thyspunt site. The document is available in English, Afrikaans, and isiXhosa to support inclusive participation.
- Who it is for:
- any member of the public interested in the Thyspunt NISL application
- How to act on it:
- Download or view the Public Information Document from the National Nuclear Regulator website
Applicants may have their application for a nuclear installation design licence accepted or rejected based on the adequacy of submitted project management documentation and initial design information. This stage determines whether the applicant can proceed to the full safety case assessment.
- Who it is for:
- applicants submitting design authorisation applications
- How to act on it:
- Submit project management documentation and initial design information to the NNR for evaluation
Once the application is accepted, the applicant must undergo a four-phase safety case assessment process, including concept design evaluation, principal safety reviews, reference design assessment, and post-assessment activities. This ensures the proposed design meets all safety requirements before proceeding.
- Who it is for:
- applicants whose design applications have been accepted
- How to act on it:
- Participate in the phased safety case assessment by submitting required documentation at each phase
This opportunity allows owners or operators of contaminated sites, particularly legacy mining sites with naturally occurring radioactive materials (NORM), to apply for the decommissioning of their site and request the release of land from regulatory control after meeting established safety criteria.
- Who it is for:
- owners or operators of legacy mining sites with NORM contamination
- How to act on it:
- Submit a decommissioning plan and radiological safety assessment to the National Nuclear Regulator, demonstrating compliance with reference levels such as 0.5 Bq/g for uranium and thorium and their progeny.