Opportunities
Browse government tenders, quotations, vacancies and documents across South Africa.
Showing opportunities with a recorded closing date that has not passed. Choose another status to browse historical records.
Businesses in Kgatelopelo Local Municipality using single or three-phase prepaid or conventional electricity meters are subject to new tariff rates, including higher energy charges and increased basic fees.
- Who it is for:
- commercial businesses using electricity meters
- How to act on it:
- No application required; tariffs are automatically applied based on meter type and usage
Schools, public benefit organisations, and entities using electricity for own use in Kgatelopelo Local Municipality are subject to new tariff rates, including adjusted energy and demand charges, and a basic charge increase.
- Who it is for:
- schools, public benefit organisations, and self-consumption users
- How to act on it:
- No application required; tariffs are automatically applied based on usage type
Property owners with vacant stands in Kgatelopelo Local Municipality must pay a basic charge for electricity service, now increased under the new tariff structure.
- Who it is for:
- owners of vacant stands requiring electricity service
- How to act on it:
- No application required; charge is applied based on property status and meter registration
Households using conventional electricity meters in Kgatelopelo Local Municipality can access electricity under new tariff rates, with tiered consumption blocks and an increased basic charge. These rates are effective as per the regulatory approval.
- Who it is for:
- domestic households using conventional electricity meters
- How to act on it:
- No application required; tariffs are automatically applied to conventional meter usage
Industrial consumers in Kgatelopelo Local Municipality are subject to revised electricity tariffs, including higher energy charges, updated demand charges per KVA, and increased basic charges for both conventional and prepaid meters.
- Who it is for:
- industrial users
- How to act on it:
- No application required; tariffs are automatically applied based on meter type and usage
A downloadable Excel template designed to guide community-owned energy projects, providing a structured framework for governance, ownership distribution, and operational planning. It is intended for use by communities, developers, and municipalities involved in renewable energy initiatives.
- Who it is for:
- community groups, project developers, local municipalities, and energy project stakeholders
- How to act on it:
- Download the file from the provided URL
This document lists 32 fuel storage facilities whose licenses have been revoked by the National Energy Regulator of South Africa due to non-compliance with Section 24(1) of the Energy Regulation Act. The list includes details such as the licensee, location, province, license number, date of application, and revocation date.
- Who it is for:
- fuel storage facility operators, energy regulators, industry stakeholders, public interested in energy compliance
- How to act on it:
- View the full list of revoked facilities in the official database published by NERSA
The draft electricity tariffs for the 2026/2027 financial year have been published by Tswelopele Local Municipality, with proposed rates for residential, business, government, NPO, departmental, vacant stand, and bulk supply users. These tariffs are subject to public comment before final approval.
- Who it is for:
- residents, businesses, government entities, NPOs, and other electricity users in Tswelopele Local Municipality
- How to act on it:
- Review the published draft tariff list and submit feedback or comments to the National Energy Regulator of South Africa through official channels before the consultation period closes.
MKhondo Municipality has submitted its main cost model for review by the National Energy Regulator of South Africa. This submission is part of the regulatory process to assess and approve the municipality's energy pricing structure.
- Who it is for:
- MKhondo Municipality
- How to act on it:
- The municipality submitted the cost model through the NERSA portal or official channel.
Residents and businesses in Emakhazeni Local Municipality can participate in a public consultation to share their views on the proposed electricity tariff increase from 1 July 2026 to 30 June 2027.
- Who it is for:
- households using prepaid electricity meters, businesses and industrial consumers, residents of Emakhazeni Local Municipality
- How to act on it:
- Attend or submit feedback during the public participation process conducted by Emakhazeni Local Municipality
This is the electricity tariff for high mast lighting systems. The rate is 189.67 c/kWh for all consumption above 0 kWh. A basic charge of R 1,966.76 applies.
- Who it is for:
- municipalities or entities operating high mast lighting systems
- How to act on it:
- No application or action required; the tariff is automatically applied to eligible users.
This is the electricity tariff for general prepaid domestic consumers. Rates are structured in blocks: 0-50 kWh at 387.40 c/kWh, 51-350 kWh at 400.21 c/kWh, 351-600 kWh at 478.42 c/kWh, and over 600 kWh at 490.38 c/kWh.
- Who it is for:
- households using prepaid domestic electricity services
- How to act on it:
- No application or action required; the tariff is automatically applied to eligible users.