Opportunities
Browse government tenders, quotations, vacancies and documents across South Africa.
Showing opportunities with a recorded closing date that has not passed. Choose another status to browse historical records.
The Development Bank of Southern Africa makes a drawings archive available, including the GROUT HOLES AND LUGEON METHOD.xlsx workbook with grout-hole report forms, calculations and test data.
- Who it is for:
- RFP respondents or contractors needing the drawings
- How to act on it:
- Download the archive from the stated source URL.
The Development Bank of Southern Africa has made available a drawing containing structural engineering general notes and construction information for new carports, a guardhouse and a boundary wall at Government Printing Works administrative headquarters.
- Who it is for:
- The Contractor, architect, Engineer's Representative and other relevant parties involved in coordinating or implementing the construction
- How to act on it:
- Download and review the drawings archive at https://www.dbsa.org/sites/default/files/media/documents/2026-08/RFP078%20Drawings%20update.zip; check the information before implementation and report discrepancies to the architect.
The BOQ makes available a construction work item for 10 m by 5 m by 2.1 m sheltered parking structures, including steelwork, profiled metal roofing, foundations, concrete bases, anchor bolts, excavation, backfilling and associated builder’s work. The listed quantity is 17.75 units.
- Who it is for:
- prospective contractors pricing the parking upgrade
The BOQ makes available a construction work item for 7.5 m by 5 m by 2.1 m shaded parking bay structures using steel supports and UV-stabilized shade cloth, including excavation, concrete foundations, anchor bolts, base plates and associated builder’s work. The listed quantity is 53.333333333333336 units.
- Who it is for:
- prospective contractors pricing the parking upgrade
A reference letter template is made available for bidders to obtain clear and verifiable client references for the gas bid window and related transaction-adviser procurement requirements. The bidder's client must complete and sign it, preferably on the client's official letterhead.
- Who it is for:
- Bidders and their clients providing references for current or previous assignments
- How to act on it:
- The bidder uses the attached template, and the client completes and signs it with the requested project, services, contract, location, value and contact details; the completed reference may be placed on the client's official letterhead.
DBSA is making available an RFP opportunity for appointing a professional service provider to stabilise water reticulation and electricity in the Thaba Tshwane Military Area in Gauteng. This annexure sets out the construction health and safety requirements for the work.
- Who it is for:
- Professional service providers
A bill of quantities is made available for pricing the preliminaries, site establishment, health and safety, supervision, liaison, surveying, geotechnical investigation and other requirements for GPW Work Package 2 concerning an overhead bridge and parking upgrade.
- Who it is for:
- Prospective contractors for GPW Work Package 2
- How to act on it:
- Download and use the BOQ from the stated DBSA URL when preparing a procurement response; the supplied text does not state a separate submission method or deadline.
The provider makes available a Bill of Quantities for pricing and planning an ICT, electrical installation and solar backup system work package, including preliminaries, site facilities, health and safety and environmental management requirements.
- Who it is for:
- Contractors pricing and delivering the specified works
- How to act on it:
- Download and use the BOQ archive available at the stated URL.
The document describes an intended appointment of a principal contractor to carry out the installation of an electronic key management system and firearm management system, subject to the stated health, safety, environmental and quality requirements.
- Who it is for:
- principal contractors
- How to act on it:
- The supplied text does not state an application or submission route.
A format for recording a company's experience through key projects, including project period, location, client, sector, value, financial close and activities performed.
- Who it is for:
- Firms submitting company experience for the tender
- How to act on it:
- Complete the company experience fields in the supplied format for each key project, including the assignment, period, location, client, sector, project value, financial close and activities performed.
The Development Bank of Southern Africa makes available a construction drawing showing basement UPS, generator, electrical, security and related building-services information for the upgrade and repair of the Government Printing Works Administrative Headquarters.
- Who it is for:
- Architects, engineers, construction teams and other parties involved in implementing or coordinating the project
- How to act on it:
- Download the drawing archive from the stated source URL.
The document relates to appointing a design-and-build contractor to complete refurbishment and upgrading work at the Hugo Bierman Building within Simonstown Naval Base.
- Who it is for:
- design and build contractors