Back to opportunities
DocumentNot applicableNotice
The appointment of a suitable multi-disciplinary built environment service provider, including the OHS agent, to provide professional services in planning, designing, and monitoring of construction for the material recovery facility (MRF),
Marine Living Resources FundRef: DFFE-B009
Official source
Source domain: dffe.gov.za
Collected on 24 November 2026
What this means
This document is a list of the sixteen bids received for tender DFFE-B009 (26/27), which seeks a multi-disciplinary built environment service provider, including an OHS agent, to plan, design and monitor construction of a material recovery facility, composting facility and supporting structures in Kouga Local Municipality, Eastern Cape, for 36 months. It lists each bidder with its quoted price, ranging from about R2.5 million to about R12 million.
Facts
Places
Eastern Cape
Reference
DFFE-B009
Amounts
R 2 509 526, R 12 017 724, R 2 500 000
Key Takeaways
- Tender DFFE-B009 (26/27)
- Sixteen bids received
- Kouga Local Municipality, Eastern Cape
- 36-month contract
- Lowest bid R2 509 526,25 (Engineering Aces)
- Highest bid R12 017 724,37 (Henry Fagan Pty Ltd)
- Lukhozi Consulting Engineers Pty Ltd
- Delta Built Environment Consultants
- Afroteam Consultants
- Infrapro Projects
- Mbawe Projects
- Engineering Aces
- DFR Kwakudi (RF)
- LA Consulting Engineers Pty Ltd
- Henry Fagan Pty Ltd
- SMEC South Africa
- Mamadi & Company SA Pty Ltd
- BVI Border Pty Ltd
- Asande Projects Pty Ltd
- MJT Consulting Engineers
- Quantra Consulting SA Pty Ltd
- V3 Consulting Engineers Pty Ltd
- Marine Living Resources Fund