Skip to content
Back to opportunities
DocumentNot applicableAnnual report

2011-2012 Annual Report

Official source

Source domain: tlabs.ac.za

Collected on 2 November 2026

What this means

This is the iThemba LABS annual report for the period April 2011 to March 2012. It reports on the laboratory's cyclotron and Van de Graaff accelerator operations, research output, a Centre of Excellence award from ANDI, beam uptime, and the procurement of an 11 MeV cyclotron with NTP Pty (Ltd).

Key Takeaways

  • Report period 1 April 2011 to 31 March 2012
  • Average beam uptime 86%
  • Van de Graaff beam availability 70%
  • Centre of Excellence status awarded by ANDI
  • 11 MeV cyclotron to be installed July 2012
  • iThemba LABS
  • National Research Foundation
  • NTP Pty (Ltd)
  • South African Nuclear Energy Corporation
  • African Network for Drugs and Diagnostics Innovation