Skip to content
Back to opportunities
DocumentOngoingPublication

NLM-PRO-00171 Public Information Document Rev 02 – Extension of the NECSA Pipestore Facility on Thabana

National Nuclear RegulatorRef: NLM-PRO-00171

Official source

Source domain: nnr.co.za

Collected on 1 October 2026

What this means

This is a 43-page public information document about the extension of the NECSA Pipestore Facility on Thabana. It describes the facility, its intended extension, transfer and placement processes, environmental monitoring, site characteristics, safety assessment and emergency planning. The document was reviewed against the detailed design and latest safety analysis report and addresses comments from the National Nuclear Regulator.

What this document offers

public information documentOngoing

PUBLIC INFORMATION DOCUMENT: EXTENSION OF THE NECSA PIPESTORE FACILITY ON THABANA

The public can read or use this document for information about the proposed extension of the NECSA Pipestore Facility on Thabana, including its design, transfer processes, monitoring, site, safety assessment and emergency planning.

Who it is for
Members of the public and other stakeholders seeking information about the facility extension
How to act on it
Read or download the public information document from the stated PDF link.

The document's recorded date is 2 March 2023. Confirm on the official source.

Show the line this came from
PUBLIC INFORMATION DOCUMENT: EXTENSION OF THE NECSA PIPESTORE FACILITY ON THABANA

Facts

Reference

NLM-PRO-00171

Key Takeaways

  • Document No. NLM-PRO-00171, Revision 02
  • Extension of the NECSA Pipestore Facility on Thabana
  • Department/Section: WASTE MANAGEMENT
  • Classification: OPEN
  • The document has 43 pages
  • Revision 01 dated 2 March 2023 changed the document number and addressed NNR comments
  • National Nuclear Regulator
  • Necsa
  • L HORDIJK
  • E VAN HEERDEN
  • B vd L NEL
  • OL SIKO
  • A KAISAVELU
  • S TWALA
  • ES TSHABALALA
  • TC AKORTIA