6. Safety & Environmental

Official source

Source domain: airports.co.za

Collected on 1 October 2026

Always confirm details on the official source before acting.

What this means

This is an archive of Airports Company of South Africa safety and environmental forms. It includes an OPS 012 permit for authorising and closing out contractor work, as well as an ACSA SHE file review form for checking contractor and stakeholder compliance documents. No application or submission deadline is stated.

What this document offers

Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.

work authorisation permitOngoing

OPS 012 Permit

A work permit for planned or unplanned work, site meetings, contractor access and other airport-related work. It records the work location, hazards, precautions, protective equipment, authorisations and completion handover.

Who it is for
contractors and people responsible for work at or connected with airport operations
How to act on it
Complete the OPS 012 permit details, identify the work and risks, specify precautions and PPE, obtain the required authorising signatures, and record completion and handover details.
Show the line this came from
OPS 012 Permit Title Planned work Unplanned Work Site Meetings Contractors M & E All Contractor Access Permit No.
compliance review formOngoing

ACSA SHE FILE REVIEW FORM

A form for reviewing a contractor or stakeholder SHE file by recording the work details, requested documents, whether each document was received, and compliance comments.

Who it is for
ACSA contractors and stakeholders
How to act on it
Provide the contractor or stakeholder, contract, project, airport, work area and scope details, then submit or complete the requested-document and compliance-status review.
Show the line this came from
ACSA SHE FILE REVIEW FORM Contractor/Stakeholder Name: Contract Number Project Manager: Airport: Area where work is to be performed: Scope of Work

Who can apply

What matters before you act: the conditions this listing sets, as Govermate read them.

OPS 012 Permit

  • The contractor log book must be signed before work authorisation.

ACSA SHE FILE REVIEW FORM

The document sets no condition.

Facts

Places

Gauteng

Key Takeaways

  • OPS 012 Permit
  • ACSA SHE FILE REVIEW FORM
  • Contractor work authorisation and handover
  • SHE file review for contractors and stakeholders
  • The Maples, Riverwoods, 24 Johnson Road, Bedfordview, Gauteng, South Africa, 2008
  • Airports Company South Africa
  • Airports Company South Africa SOC Ltd
  • R Morar
  • B Maseko
  • K Matlou
  • S Simelane
  • M Mabela
  • D Botha
  • N Kekana