Back to opportunities
DocumentClosing date not statedTender

Drawings & Annexures

Official source

Source domain: dbsa.org

Collected on 16 September 2026

Always confirm details on the official source before acting.

What this means

This is an environmental site-management and rehabilitation specification contained in the Drawings and Annexures archive for RFP089.2026. It sets environmental, landscaping and rehabilitation requirements for construction of the Tzaneen Dam Raising Project. Contractors must price these requirements and comply with them, including appointing a full-time approved Environmental Representative.

What this document offers

Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.

tender specificationClosing date not stated

ENVIRONMENTAL SITE MANAGEMENT AND REHABILITATION REQUIREMENTS

Contractors can use these environmental, conservation, landscaping and site-rehabilitation requirements as part of the tender documentation for the Tzaneen Dam Raising Project and must include the related items in their pricing.

Who it is for
Contractors tendering for the Tzaneen Dam Raising Project
How to act on it
Download the Drawings and Annexures archive from the stated DBSA link and use the environmental requirements when preparing and pricing the tender.
Closes
Closing date not stated in the source
Show the line this came from
This document forms part of the Tender Documents and must be priced for.

Facts

Reference

089.2026

Key Takeaways

  • RFP089.2026
  • Tzaneen Dam Raising Project
  • Environmental Site Management and Rehabilitation Requirements
  • The document forms part of the Tender Documents and must be priced for
  • Contractors must appoint a full-time CER approved by the ECO
  • Employees breaching environmental requirements may be ordered to leave the site
  • Development Bank of Southern Africa Limited
  • DWS

Dates

Closing Date

Closing date not stated in the source