Back to opportunities
DocumentOngoingOther

SHEQ Annexures

Development Bank of Southern Africa LimitedRef: DWS/DBSA/TZANEEN/HSS/AR/2026/01

Official source

Source domain: dbsa.org

Collected on 16 September 2026

Always confirm details on the official source before acting.

What this means

This is a project-specific client health and safety specification issued for construction work associated with raising Tzaneen Dam. It sets out occupational health and safety requirements for the demolition and removal of structural concrete and identifies the project personnel, document number and revision. The annexures are made available by the Development Bank of Southern Africa Limited through the supplied archive link.

What this document offers

Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.

construction compliance specificationOngoing

Client Health and Safety Specifications

The provider makes available the health and safety requirements for the demolition and removal of structural concrete in preparation for construction at Tzaneen Dam. The specification is intended to guide health and safety arrangements for persons involved in the construction work.

Who it is for
contractors and other persons involved in the Tzaneen Dam demolition and construction works
How to act on it
Access or download the SHEQ Annexures archive using the stated URL.

The document's recorded date is 20 May 2026. Confirm on the official source.

Show the line this came from
Health and safety specification means a documented specification of all health and safety requirements pertaining to the associated works on a construction site, so as to ensure the health and safety of persons.

Facts

Reference

DWS/DBSA/TZANEEN/HSS/AR/2026/01

Key Takeaways

  • Project: Groot Letaba River Water Development (GLeWaP): Raising of Tzaneen Dam
  • Demolition and removal of structural concrete in preparation for construction
  • Document number DWS/DBSA/TZANEEN/HSS/AR/2026/01
  • Revision 00
  • Issued for construction on 20/05/2026
  • Department of Water and Sanitation: South Africa
  • Development Bank of Southern Africa Limited
  • Development Bank of Southern Africa Limited
  • Department of Water and Sanitation: South Africa
  • DBSA
  • ARQ Dams (Pty) Ltd
  • ARQ (Pty) Ltd
  • SHE Group
  • Cobus Nienaber
  • Cindie Venter
  • Jacob Tshiwilowilo
  • Henry-John Wright
  • Francois du Toit