Official source
Source domain: musina.gov.za
Collected on 9 September 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Contractor for the construction of 1.7 km stormwater channel and pedestrian bridge in Freedom Park
A construction contract is available for the building of a 1.7-kilometre stormwater channel and a pedestrian bridge in Freedom Park, Musina. This opportunity is open to qualified contractors who meet the eligibility criteria set by Musina Local Municipality.
Contractor for the construction of 1.7km Stormwater Channel and Pedestrian Bridge in Freedom Park CLOSING DATE: 30 SEPTEMBER 2026 @11H00
Places
Limpopo
Reference
https://www.musina.gov.za/download/contractor-for-the-construction-of-1-7-km-stormwater-channel-and-pedestrian-bridge-in-freedom-park/
Parties
Freedom Park. The municipality
Closing Date
30 September 2026 (5d left)