Official source
Source domain: etenders.gov.za
Collected on 23 September 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Design, Supply, Installation, and Commissioning of Fire Water and Booster Pump Stations at ORTIA
This opportunity invites qualified contractors and service providers to bid for the design, supply, installation, and commissioning of new fire water pump stations and a booster pump station at ORTIA, located in Kempton Park, Gauteng. The project duration is 24 months.
Places
Gauteng
Reference
OCDS-9T57FA-169048
IFB
Opening Date
4 September 2026
Closing Date
5 October 2026
DESIGN, SUPPLY, INSTALLATION, AND COMMISSIONING FOR THE REPLACEMENT OF THE FIRE WATER PUMP STATIONS AND THE BOOSTER PUMP STATION AT ORTIA FOR A PERIOD OF 24 MONTHS