Official source
Source domain: dbsa.org
Collected on 3 September 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Participation in RFP143/2026: Pre-feasibility Studies for PIM and SORE Workstreams
Bidders can apply to provide consultancy services for the preparation of twelve pre-feasibility studies across three provinces—nine PIM studies (three per province in Eastern Cape, KwaZulu-Natal, and Northern Cape) and three SORE studies (one per province). The consultant will conduct assessments including technical, financial, social, environmental, and legal evaluations, with stakeholder engagement required only for the SORE workstream.
Places
Eastern Cape, KwaZulu-Natal, Northern Cape
Reference
https://www.dbsa.org/sites/default/files/media/documents/2026-09/RFP143.2026%20-%20Clarification%20and%20Response.pdf
The assignment shall include the preparation of three PIM pre-feasibility studies per province in each of the three target provinces (Eastern Cape, KwaZulu-Natal, and Northern Cape), resulting in a total of nine (9) PIM pre-feasibility studies. In addition, three (3) SORE pre-feasibility studies will be conducted, one in each of the three provinces: KwaZulu-Natal, Northern Cape, and Eastern Cape.