Official source
Source domain: mhlathuze.co.za
Collected on 2 September 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Appointment of a Turnkey Contractor for the Design and Construction of a Pre-Thickener and Rehabilitation of Digester 5&6 Staircase
A turnkey contractor is being appointed to design and construct a pre-thickener and rehabilitate the staircase of Digester 5 and 6. This opportunity is open to qualified construction companies capable of delivering a full design-and-build solution.
Reference
https://mhlathuze.co.za/tender/appointment-of-a-turnkey-contractor-for-the-design-and-construction-of-a-pre-thickener-and-rehabilitation-of-digester-56-staircase/
Closing Date
1 October 2026 (7d left)
Appointment of a Turnkey Contractor for the Design and Construction of a Pre- Thickener and Rehabilitation of Digester 5&6 Staircase