Official source
Source domain: nersa.org.za
Collected on 1 September 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Domestic High (30 and >30 Ampere Single Phase) Tariff Application
This opportunity allows residential customers with higher power needs to apply for the 30 Ampere or higher single-phase electricity tariff, which includes two consumption blocks and fixed monthly charges. It is available for pre-paid systems only.
Domestic High (30 and >30 Ampere single Phase) 2025/26 Approved 2026/27 Application
Reference
https://www.nersa.org.za/file/8492/SaldanhaBay-tariffapplication.pdf
Industrial Electricity Tariff Application (Bulk MV > 1000kVA)
This opportunity allows large industrial consumers with over 1000kVA capacity to apply for a bulk medium-voltage electricity tariff, with specific charges for basic, energy, and demand usage.
Bulk MV > 1000kVA 2025/26 Approved 2026/27 Application
Commercial Electricity Tariff Application
This opportunity allows commercial businesses to apply for a standard commercial electricity tariff based on energy use, service charge, and capacity charge. Available connection sizes include single and three-phase options up to 80 Ampere.
COMMERCIAL TARIFFS 2025/26 Approved 2026/27 Application
Industrial Electricity Tariff Application (Bulk LV 501 to 630kVA)
This opportunity allows industrial consumers with between 501kVA and 630kVA capacity to apply for a bulk low-voltage electricity tariff, with specific charges for basic, energy, and demand usage.
Bulk LV 501 to 630kVA 2025/26 Approved 2026/27 Application
Industrial Electricity Tariff Application (Bulk MV 501 to 1000kVA)
This opportunity allows industrial consumers with between 501kVA and 1000kVA capacity to apply for a bulk medium-voltage electricity tariff, with defined charges for basic, energy, and demand usage.
Bulk MV 501 to 1000kVA 2025/26 Approved 2026/27 Application
Domestic Low (20 Ampere Single Phase) Tariff Application
This opportunity allows residential customers to apply for the 20 Ampere Single Phase electricity tariff, which includes two consumption blocks and fixed monthly charges. The tariff is applicable for the 2026/27 financial year and is available for new connections.
Domestic Low (20 Ampere Single Phase) 2025/26 Approved 2026/27 Application
Indigent Consumer Subsidy for Electricity Charges
Indigent consumers are eligible for subsidies covering the monthly service charge, monthly capacity charge, and the first 50 units of electricity per month.
Note that Indigent consumers will be subsidised for the Monthly Service Charge, the Monthly Capacity Charge as well as for the first 50 units of electricity per month.
Small Scale Embedded Generation In-Feed Tariff Application
This opportunity allows small-scale generators to apply for an in-feed tariff to sell excess electricity back to the grid, subject to compliance with municipal requirements. The rate is R1.14 per kWh for the 2026/27 year.
Small Scale Embedded Generation 2025/26 Approved 2026/27 Application In-Feed Tariff R/kWh R/kWh
New Electricity Connection (Pre-Paid) Application
All new electricity connections will be on a pre-paid tariff system, allowing customers to pay in advance for electricity usage. This applies to all domestic and commercial customers.
Note that all new connections will be on a Pre-Paid tariff.
Industrial Electricity Tariff Application (Bulk LV & MV 71kVA to 500kVA)
This opportunity allows industrial consumers with between 71kVA and 500kVA capacity to apply for a bulk low- and medium-voltage electricity tariff, including basic, energy, and demand charges.
Bulk LV & MV 71kVA to 500kVA 2025/26 Approved 2026/27 Application
Industrial Electricity Tariff Application (Bulk LV Up to 70kVA)
This opportunity allows industrial consumers with up to 70kVA capacity to apply for a bulk low-voltage electricity tariff, which includes basic, energy, and demand charges based on usage and peak demand.
Bulk LV Up to 70kVA 2025/26 Approved 2026/27 Application