Official source
Source domain: cdm.org.za
Collected on 1 September 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Groothoek RWS: Makweng WSIG – Phase 2
This project involves the construction of approximately 6.1km of water pipeline, 80 RDP standpipes, a 150-kilolitre elevated steel tank, and fencing of the storage facility in Zebediela. It has a construction value of R9.62 million.
The document's recorded date is 26 August 2026. Confirm on the official source.
Reference
https://www.cdm.org.za/water-supply-projects-handed-over-in-zebediela/
Amounts
R 9 620 000, R 13 160 000
Closing Date
26 August 2026
The first project, Groothoek RWS: Makweng WSIG – Phase 2, has a construction value of R9.62 million. The project includes approximately 6.1km of water pipeline, 80 RDP standpipes, a 150-kilolitre elevated steel tank and fencing of the storage facility.
Ga-Rakgwatha Water Services Infrastructure Grant (WSIG) Project
This project includes approximately 6.1km of water pipeline, 60 RDP standpipes, a new 150-kilolitre elevated steel tank, equipping and electrification of two boreholes, two concrete pump houses, and fencing of the boreholes and storage facility. It has a construction value of R13.16 million.
The document's recorded date is 26 August 2026. Confirm on the official source.
The second project, the Ga-Rakgwatha Water Services Infrastructure Grant (WSIG) Project, has a construction value of R13.16 million. Its scope includes approximately 6.1km of water pipeline, 60 RDP standpipes, a new 150-kilolitre elevated steel tank, the equipping and electrification of two boreholes, two concrete pump houses, as well as fencing of the boreholes and storage facility.