Back to opportunities
DocumentNot applicablePublication

SCHOOL HALL PROJECT EXPENSES

CROSSMOOR SECONDARY SCHOOLRef: https://www.crossmoorsecondary.co.za/docs/SCHOOL%20HALL%20PROJECT%20EXPENSES.pdf

Official source

Source domain: crossmoorsecondary.co.za

Collected on 21 August 2026

Always confirm details on the official source before acting.

What this means

This document is a detailed cost breakdown for the construction of a multi-purpose hall at Crossmoor Secondary School, dated 15 May 2012. It lists materials, quantities, rates, and amounts for various components of the project, including foundations, concrete work, brickwork, windows, doors, flooring, plumbing, electrical, and structural elements. The total cost excluding VAT is R2,779,315.79, as prepared by Thandaza Structures cc t/a Pro-Spec.

Facts

Reference

https://www.crossmoorsecondary.co.za/docs/SCHOOL%20HALL%20PROJECT%20EXPENSES.pdf

Amounts

R 2 779 316

Key Takeaways

  • 15 May 2012
  • MULTI PURPOSE HALL CROSSMOOR SEC
  • R2,779,315.79
  • Thandaza Structures cc t/a Pro-Spec
  • Crossmoor Secondary School
  • Foundations
  • Concrete columns
  • Aluminium windows
  • Brickwork
  • Steel Cantilever Canopy
  • Crossmoor Secondary School
  • Thandaza Structures cc t/a Pro-Spec
  • Crossmoor