DocumentNot applicablePublication
SCHOOL HALL PROJECT EXPENSES
CROSSMOOR SECONDARY SCHOOLRef: https://www.crossmoorsecondary.co.za/docs/SCHOOL%20HALL%20PROJECT%20EXPENSES.pdf
Official source
Source domain: crossmoorsecondary.co.za
Collected on 21 August 2026
Always confirm details on the official source before acting.
What this means
This document is a detailed cost breakdown for the construction of a multi-purpose hall at Crossmoor Secondary School, dated 15 May 2012. It lists materials, quantities, rates, and amounts for various components of the project, including foundations, concrete work, brickwork, windows, doors, flooring, plumbing, electrical, and structural elements. The total cost excluding VAT is R2,779,315.79, as prepared by Thandaza Structures cc t/a Pro-Spec.
Facts
Reference
https://www.crossmoorsecondary.co.za/docs/SCHOOL%20HALL%20PROJECT%20EXPENSES.pdf
Amounts
R 2 779 316
Key Takeaways
- 15 May 2012
- MULTI PURPOSE HALL CROSSMOOR SEC
- R2,779,315.79
- Thandaza Structures cc t/a Pro-Spec
- Crossmoor Secondary School
- Foundations
- Concrete columns
- Aluminium windows
- Brickwork
- Steel Cantilever Canopy
- Crossmoor Secondary School
- Thandaza Structures cc t/a Pro-Spec
- Crossmoor