Official source
Source domain: dbsa.org
Collected on 8 August 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Pre-feasibility Study for Embedded Power Generation
The DBSA is conducting a pre-feasibility study for embedded power generation in Matzikama Municipality as part of the Embedded Generation Investment Programme (EGIP), which may lead to the development of micro and mini power grids.
The DBSA supported the municipality with a pre-feasibility study as part of our Embedded Generation Investment Programme (EGIP), which will potentially contribute to the development of micro and mini power grids across the municipality.
Places
Western Cape
Reference
https://www.dbsa.org/index.php/projects/matzikama-municipality
Infrastructure Masterplan Updates
The Development Bank of Southern Africa is supporting Matzikama Municipality in updating its outdated masterplans for water, wastewater, and electrical infrastructure. This includes preparing a 1 000kwp solar power plant in Vredendal and updating the spatial development framework and capital expenditure framework.
To update the municipality’s outdated masterplans for water, wastewater and electrical infrastructure. To prepare a 1 000kwp solar power plant in Vredendal. To update its spatial development framework (SDF) and capital expenditure framework (CEF).