Construction of Northmead Reservoir
A 5.5 Mℓ elevated water reservoir being constructed in Northmead, Benoni, to address persistent water supply problems and low water pressure in the reticulation network. The project is funded at R44.6 million and commenced in May 2018.
The project commenced in May 2018 and is still in execution.
Places
Ekurhuleni, Gauteng
Reference
https://www.dbsa.org/index.php/projects/enhancing-potable-water-supply-city-ekurhuleni
Amounts
R 44 600 000, R 56 700 000
Construction of Isando Reservoir
A 15 Mℓ circular reinforced-concrete reservoir with a domed roof, guardhouse, valve chambers, and access road, currently under construction in Isando. The project is funded at R56.7 million and is expected to be completed by December 2020.
The project is estimated to be completed in December 2020 with cumulative expenditure at the end of the year under review amounting to R17 million.
Construction of Etwatwa Reservoir (Mandela Tower)
A 1.1 Mℓ reservoir with architectural features inspired by a solar calendar, commemorating Nelson Mandela’s life. It will include pump station alterations, an access road, and special design elements that align sunlight with his birth and death dates. The project commenced in January 2018 and will be known as the ‘Mandela Tower’.
The project commenced in January 2018.