Official source
Source domain: bnlm.gov.za
Collected on 6 August 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Refurbishment of Existing Boreholes in Steytlerville
Funds have been allocated to refurbish existing boreholes in Steytlerville to improve water access and reliability during drought conditions.
Steytlerville: Refurbishment of existing boreholes 2 404 400.00
Reference
R42 MILLION
Amounts
R 42 000 000, R 53 789 000 000, R 30 000 000
Replacement of Unrepairable Water Mains in Jansenville
R450,000 has been allocated to replace water mains in Jansenville that can no longer be repaired, improving water delivery reliability.
Jansenville: Replace water mains which can no longer be repaired 450 000.00
Installation of Water Meters in Dr Beyers Naude Municipality
A project to install water meters has been funded with R6.05 million to improve water usage monitoring and management across the municipality.
Dr Beyers Naude: Installation of water meters 6 050 000.00
Future Groundwater Development in Rietbron
R1.5 million has been allocated for future groundwater development in Rietbron to secure long-term water supply for the area.
Rietbron: Future Groundwater development 1 500 000.00
Drought Relief Funding for Water Projects
The Dr. Beyers Naude Local Municipality has been allocated R30 million in drought relief funding to support various water infrastructure improvements across multiple towns including Graaff-Reinet, Jansenville, Steytlerville, Rietbron, and others. This includes emergency water supply schemes, borehole refurbishment, water meter installation, and groundwater development.
The application was approved to an amount of R30 million made up as follows: