Design Authorisation Framework
Official source
Source domain: nnr.co.za
Collected on 6 August 2026
Always confirm details on the official source before acting.
What this means
What this document offers
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Stage 1: Acceptance/Rejection of Application
Applicants may have their application for a nuclear installation design licence accepted or rejected based on the adequacy of submitted project management documentation and initial design information. This stage determines whether the applicant can proceed to the full safety case assessment.
- Who it is for
- applicants submitting design authorisation applications
- How to act on it
- Submit project management documentation and initial design information to the NNR for evaluation
Show the line this came from
6.1 Acceptance/rejection of the application 11
Stage 2: Safety Case Assessment
Once the application is accepted, the applicant must undergo a four-phase safety case assessment process, including concept design evaluation, principal safety reviews, reference design assessment, and post-assessment activities. This ensures the proposed design meets all safety requirements before proceeding.
- Who it is for
- applicants whose design applications have been accepted
- How to act on it
- Participate in the phased safety case assessment by submitting required documentation at each phase
Show the line this came from
7 DESIGN ASSESSMENT PROCESS - ASSESSMENT OF THE SAFETY CASE FOR A DESIGN OF A NUCLEAR INSTALLATION (STAGE 2) 13
Facts
Reference
PP-0008
Key Takeaways
- PP-0008
- Design Authorisation Framework
- National Nuclear Regulator (NNR)
- nuclear installation licence to design
- Stage 1: Acceptance/Rejection of Application
- Stage 2: Safety Case Assessment
- Reference Design
- Concept Design
- Safety Evaluation Report (SER)
- Section 5(b) of NNR Act
- ALARA, DiD, PIRT, FMECA, HAZOP, V&V
- costs recovered hourly and monthly
- five-year safety case submission timeframe
- National Nuclear Regulator (NNR)
- Acting Chief Executive Officer
- Manager: PBMR
- P Bester
- Senior Regulatory Officer
- J Joubert
- K Naidoo
- R Elk
- T Pather
- THill
- G Nhlapho
- A Muller
- o Phillips
- M Msebenzi
- NNR Act
- Appendix A
- Appendix B