Approval to install a Small-Scale Embedded Generation (SSEG) system
Customers can apply for written approval from the Swartland Local Municipality to install a solar PV or other grid-connected embedded generation system. The application must be submitted before any installation begins, and approval must be received before equipment is purchased or work starts.
Reference
https://www.swartland.org.za/assets/municipal-services/Circular%20to%20Customers%20regarding%20installing%20SSEG%20systems%20Final.pdf
Parties
SALGA and AMEU endorsed approach in the municipality, Electrical Engineering Services Department before installation. The municipality
The relevant Application Form is to be completed and submitted to the Electrical Engineering Services Department before commencing installation.
Access to the Commissioning Report template
A commissioning report is required after installation to confirm that the embedded generation system meets all technical and safety standards. This form is available on the municipality’s website or through direct contact with the Electrical Engineering Services Department.
Documents can be obtained from the municipal Website at www.swartland.org.za under Documents, SSEG or by contacting the municipality at swartlandmun@swartland.org.za or by contacting the Electrical Engineering Services Department, SSEG@swartland.org.za or by phoning us at 022 487 9400
Access to the SSEG Application Form
The official application form required to request approval for installing a small-scale embedded generation system is available online through the Swartland Local Municipality website or by contacting the Electrical Engineering Services Department.
Documents can be obtained from the municipal Website at www.swartland.org.za under Documents, SSEG or by contacting the municipality at swartlandmun@swartland.org.za or by contacting the Electrical Engineering Services Department, SSEG@swartland.org.za or by phoning us at 022 487 9400
Access to the 'Requirements for Embedded Generation: Conditions and application process' document
The full set of conditions and procedures for installing embedded generation systems in Swartland is available for download from the municipality’s website under Documents/SSEG or by contacting the municipality directly.
Documents can be obtained from the municipal Website at www.swartland.org.za under Documents, SSEG or by contacting the municipality at swartlandmun@swartland.org.za or by contacting the Electrical Engineering Services Department, SSEG@swartland.org.za or by phoning us at 022 487 9400