Official source
Source domain: swartland.org.za
Collected on 31 July 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Application for Connection of Embedded Generation
Residents, businesses, and property owners in Swartland Municipality can apply to connect an embedded generator (up to 1MVA) to the local electricity network. This includes solar, wind, hydro, and diesel generators that are used for self-consumption. Applicants must provide technical details, installer credentials, and comply with national standards like NRS097-2 and SANS wiring codes. If needed, the municipality may require a grid impact study, which the applicant will be asked to pay for after a quote is provided.
Reference
NRS097-2-3
This application form is for the connection of embedded generation to the electricity network of Swartland Municipality.