Annexure A Sub-Project Disclosure Form - Mulilo Newcastle Wind Energy Facility
This form discloses key information about the sub-project components of the Mulilo Newcastle Wind Energy Facility, including ownership, funding, and implementation details.
Annexure A Sub-Project Disclosure Form - Mulilo Newcastle Wind Energy Facility
Places
Newcastle Local Municipality, KwaZulu-Natal
Reference
https://www.dbsa.org/mulilo-newcastle-wind-energy-facility
Mulilo Newcastle Wind Power WEF Final EIAR 2024
This is the final Environmental Impact Assessment Report for the Mulilo Newcastle Wind Power WEF. It details the potential environmental effects of the proposed wind energy facility and includes mitigation measures.
Environmental Impact Assessment Report: MuliloNewcastle WEF Wind Power WEF Final EIAR 2024
MuliloNewcastle WEF Appendix G2 - Final Generic EMPr
This is the generic Environmental Management Programme for the Mulilo Newcastle Wind Power WEF. It provides standardised environmental management practices applicable across similar projects.
and MuliloNewcastle WEF Appendix G2 - Final Generic EMPr
Appendix E2 Generic EMPr Substation
This is the generic Environmental Management Programme for the substation component of the grid connection infrastructure. It details how environmental risks associated with substation construction and operation will be managed.
Appendix E2 Generic EMPr Substation
MuliloNewcastle WEF Appendix G1 - Final EMPr
This is the final Environmental Management Programme for the Mulilo Newcastle Wind Power WEF. It outlines how environmental impacts will be monitored and managed during construction and operation.
Environmental Management Programme: MuliloNewcastle WEF Appendix G1 - Final EMPr
MNWP Grid Connection Final BAR
This is the final Basic Assessment Report for the grid connection infrastructure of the Mulilo Newcastle Wind Power WEF. It evaluates the environmental implications of connecting the facility to the power grid.
Basic Assessment Report: MNWP Grid Connection Final BAR
Appendix E1 Generic EMPr Powerline
This is the generic Environmental Management Programme for the powerline component of the grid connection infrastructure. It sets out environmental monitoring and mitigation requirements for powerline development.