What this means

This document is a guideline from the Planning & Design Land Use Management Unit explaining how to lodge an application for rezoning, subdivision, township establishment, and for (1) relaxation of a building line from a provincial road and (2) construction of an access to a provincial road from adjacent land. It sets out a two-stage process: first a request for comments by a town planning consultant, then a formal application by a civil consultant. It specifies required documents, minimum building-line distances from provincial road centreline/road reserve boundary, and an application fee of R3,600 payable on/after submission at both stages.

Facts

Reference

https://www.ral.co.za/wp-content/uploads/2026/06/GUIDELINE-REQUEST-APPLICATION-04-2026.pdf

Amounts

R 3 600, R 4

Parties

Road authority

Key Takeaways

  • Two-stage application process: town planning consultant comments first, then civil consultant application
  • Building line distances from provincial roads: filling station >=45m from centreline; residential township >=16m from road reserve boundary; other developments >=20m from road reserve boundary; farm subdivision >=95m from centreline
  • Stage 1 documents include signed cover letter, motivational memorandum, 1:50 000 locality/topographical map, layout plan, title deed or letters confirming ownership, and road authority comments if applicable
  • Stage 2 documents include signed cover letter, complete application forms, 1:50 000 locality/topographical map, detailed engineering drawings of access, KMZ file, layout plan, and traffic impact assessment by email only for filling station/shopping centre/big developments
  • Application fee: R3 600.00 payable on/after submission at both stages
  • Road authority comments required when provincial road connects to SANRAL (National Route) or a municipal road (Local Municipality); not compulsory if two-stage process is followed