Rapid Pothole Repair by means of High-Volume Blower for 24 months as and when required
Official data source
Collected on 27 June 2026
This record comes straight from the official government data feed. The official documents are attached below.
What this means
What this document offers
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Rapid Pothole Repair by means of High-Volume Blower for 24 months as and when required
The Ephraim Mogale Local Municipality is procuring rapid pothole repair services using a high-volume blower for a period of 24 months, to be carried out as needed. The contract is awarded to qualified service providers who meet specific technical and qualification criteria.
- Who it is for
- contractors with CIDB grading 3SB or higher and those who can score at least 70 out of 100 on functionality
- How to act on it
- Submit a bid through the official e-tender portal, including all required documentation as specified in the tender document.
- Closes
- 14 January 2022
Show the line this came from
Rapid Pothole Repair by means of High-Volume Blower for 24 months as and when required
Facts
Places
Limpopo
Reference
OCDS-9T57FA-12861
Target Type
IFB
Dates
Opening Date
25 November 2021
Closing Date
14 January 2022