DocumentNot applicableProcurement unspecified
Dbsa Ready Groundbreaking 2024 Ipp Procurement Programmes
Official source
Source domain: dbsa.org
Collected on 28 June 2026
Always confirm details on the official source before acting.
What this means
The document announces DBSA’s readiness to support groundbreaking 2024 IPP Procurement Programmes under the IPPPP, aligning with IRP2019 and detailing three bid windows: 5000 MW renewable energy (REIPPPP BW7), 2000 MW Gas to Power (GASIPPPP BW1), and 615 MW Battery Energy Storage (BESIPPPP BW2). It emphasizes DBSA’s ongoing financing role in South Africa’s energy sector and cites previous IPPPP projects the bank has financed. The piece presents the DBSA as a leading investor in diverse energy technologies within the IPPPP framework.
Facts
Places
City of Johannesburg, Gauteng
Key Takeaways
- organization: Development Bank of Southern Africa (DBSA)
- subject: readiness for groundbreaking 2024 IPP Procurement Programmes
- programmes: REIPPPP BW7 5000 MW, GASIPPPP BW1 2000 MW, BESIPPPP BW2 615 MW
- total target capacity: 7615 MW
- alignment: Ministerial Determinations from IRP2019
- date: 25 January 2024
- location: Johannesburg
- context: IPPPP led by Department of Mineral Resources and Energy
- prior involvement: DBSA has financed numerous IPPPP projects
Dates
Closing Date
25 January 2024