Official source
Source domain: bnlm.gov.za
Collected on 28 June 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Surge protection system review and redesign
Subcontractors will conduct an on-site assessment of the surge protection system at the Erasmuskloof pump site to determine if a redesign is needed to prevent power surges from disrupting water pump operations.
The document's recorded date is 1 April 2025. Confirm on the official source.
To resolve this, an on-site review will be conducted by subcontractors to assess and, if necessary, redesign the surge protection system.
Reference
https://www.bnlm.gov.za/documents?upf=dl&id=5663
Parties
The municipality