Back to opportunities
DocumentClosedannual report

iThemba LABS Annual Report 2009-2010

iThemba Laboratory for Accelerator Based SciencesRef: https://tlabs.ac.za/wp-content/uploads/2025/02/iThemba_LABS_Annual_Rep_2009-2010.pdf

Official source

Source domain: tlabs.ac.za

Collected on 17 June 2026

Always confirm details on the official source before acting.

What this means

The document is iThemba LABS Annual Report 2009/10, covering the period 1 April 2009 to 31 March 2010, published in 2011. It presents the institution’s role as Africa’s largest cyclotron facility, its mission within the National System of Innovation, and the main user groups (nuclear physics, therapy, and nuclear medicine). It emphasizes community engagement and visibility of national research entities, citing a Minister of Science and Technology visit on 23 February 2010. The foreword outlines iThemba LABS’ commitment to delivering reliable beams and engaging with higher education partners and society at large.

Facts

Reference

https://tlabs.ac.za/wp-content/uploads/2025/02/iThemba_LABS_Annual_Rep_2009-2010.pdf

Key Takeaways

  • organization: iThemba LABS
  • period: 1 April 2009 to 31 March 2010
  • publication: 2011
  • facility: Separate-sector Cyclotron (SSC)
  • main user groups: nuclear physics, therapy, nuclear medicine
  • ministerial visit: 23 February 2010
  • location: Somerset West, South Africa
  • publisher: National Research Foundation (copyright)

Dates

Opening Date

22 February 2025