Official source
Source domain: siyancuma.gov.za
Collected on 17 June 2026
Always confirm details on the official source before acting.
Read out of this document by Govermate's AI, in its own words. Each one quotes the line it came from — confirm on the official source before acting.
Request a special electricity meter reading
The draft tariff list sets a charge for a special meter reading per request when requested by the client.
The document's recorded date is 1 July 2026. Confirm on the official source.
d) Special meterreading Per Request 1. If a special reading is requested by the client.
Reference
https://siyancuma.gov.za/wp-content/uploads/2026/03/Draft-tariff-list-2026_27.pdf
Closing Date
1 July 2026
Pay electricity fines for tampering/interference (Section 24)
The draft tariff list sets out electricity fines payable when a supply point is cut off due to violation of Section 24 (tampering and interference) of the Councils electricity ordinance by the occupier, with separate amounts for households and businesses.
The document's recorded date is 1 July 2026. Confirm on the official source.
FINES 2. Fee is payable when supply point is cut off due to violation of Section 24 (tampering and inteference) of Councils electricity ordanance, ny the occupier: Household First Fine R3 500.00 Second Fine Third Fine Business First Fine Second Fine
Pay electricity call-out fees when the fault is on the client’s side
The draft tariff list includes call-out fees per call, applicable when the municipality is called out and the fault is due to a problem on the client’s side.
The document's recorded date is 1 July 2026. Confirm on the official source.
c) Call-out-fees Per call 1. If municipality is called out and it occures that the fault is becauce of a probleem on the side of the client
Pay for new electricity connections to the main line
The draft tariff list sets charges for new electricity connections to the main line, including single-phase and three-phase connection options, with maximum request limited to actual cost.
The document's recorded date is 1 July 2026. Confirm on the official source.
f) New Connection If connection must be done to the main line. Single phase (Conventional or Pre-paid meter) Three phase (Convensional or Pre-paid meter) Maximum request = Actual cost
Request testing of an electricity meter
The draft tariff list sets a charge for meter testing per meter if required by the customer; it also states that if the meter is at fault the customer will be reimbursed.
The document's recorded date is 1 July 2026. Confirm on the official source.
e) Test of Meter Per Meter If it is required by customer that meter must be tested. If meter is at fault customer will be reimbursted.
Apply/receive electricity service connection and reconnection (including prepaid and conventional)
The draft tariff list sets the charges for prepaid and conventional electricity connections and reconnections, including a reconnection fee structure and related service charges for customers whose supply is cut off.
The document's recorded date is 1 July 2026. Confirm on the official source.
ELECTRICITY SERVICES SERVICE CHARGES a) Connection Per Pre-paid Connection This is when service is changed between customers. b) Re-connection Conventional meter Pre-paid meter (If customers name is on cutlist weather it has already been cut or not.)
Pay for replacement of electricity meters (conventional/prepaid)
The draft tariff list sets charges for replacing electricity meters (not part of general replacement), including replacement of conventional and prepaid meters for single-phase and three-phase, charged as actual cost plus 14.9%.
The document's recorded date is 1 July 2026. Confirm on the official source.
g) Replacing (not part of general replacement of meters) Replacement of conventional meter single phase pre-paid meter Replacement of conventional meter three phase pre-paid meter Actual cost + 14,9% Actual cost + 14,9% Actual cost + 14,9% Actual cost + 14,9%