This document is a South African Forestry Company SOC Ltd (SAFCOL) Request for Quotations (RFQ) for the construction of a foot timber bridge at Fernie A, Super Section Ward 3. The RFQ number is RFQ/110/179/2025, issued on 24 October 2025, with closing time 12:00PM on 10 November 2025; quotations are valid for 60 days from the closing date. It sets out submission requirements (including B-BBEE verification, tax compliance, and returnable documents), evaluation phases and specific goals/points, and disqualification reasons. The scope of work includes foundations, excavations, concrete, gabions and retaining structures, filter fabric, stonework, paving/walkways, and CCA-treated timber poles, walkways, balustrades and handrails for SAFCOL 2025/2026.
Check the dates below
This summary is generated from the source document and may mention different dates. The Dates panel below is compiled from the official structured record and is authoritative — rely on it, and confirm on the official source before acting.
- Official closing date: 24 October 2025
Facts
Reference
IS RFQ/110/179/2025
Key Takeaways
- SAFCOL SOC LTD
- RFQ number: RFQ/110/179/2025
- RFQ issue date: 24 October 2025
- Closing date/time: 10 November 2025 at 12:00PM
- Late submissions not accepted
- RFQ validity: 60 days from closing date
- Project: construction of foot timber bridge at Fernie A, Super Section Ward 3
- Contact person: Sibongiseni Mgushelo (013 754 2700 ext 2870; 0664790612)
- Specification enquiries email: sibongiseni.mgushelo@safcol.co.za
- RFQ responses email: RFQHighveld@safcol.co.za (use RFQ number in subject)
- B-BBEE: SANAS-accredited verification certificate or EME/QSE sworn affidavit
- Tax compliance: verified via CSD or SARS e-Filing; 7 working days to rectify if non-compliant
- Evaluation phases: administrative compliance, mandatory evaluation, then price & specific goals (80/20)
- Specific goals points: 51%+ Black owned (20), total specific goals points 20
- Mandatory evaluation includes: Grade 1 GB CIDB or higher, valid COIDA, and bidder must be from Chief Albert Luthuli Local Municipality (Mpuluzi Unit only) with proof of residence/business address
- Returnable documents include: completed/signed RFQ, company letterhead quotation, latest tax clearance, latest B-BBEE certificate or sworn affidavit, CK documents, CSD registration report/MAAA number, and ID copies of directors
- SAFCOL SOC LTD
- Sibongiseni Mgushelo
- SARS
- Central Supplier Database (CSD)
- National Treasury
- National Treasury’s Database of restricted suppliers and defaulters
- SANAS
- Chief Albert Luthuli Local Municipality
- Mpuluzi Unit
- Commissioner of Oaths
- CIPC
- CIDB
- COIDA
Dates
Closing Date
24 October 2025